Data centers
Kuusaa DC (New)
Site location in the heart of the Eastern Finland DC area with substantial power grid
capacity in the region.
Brown field plot currently zoned for social/educational services in the vicinity of
Kouvola city centre.
Plot building rights 22 800 sqm and plot size 10 hectare with possibility to increase
both footprint and building rights to nearby plots.
Mostly levelled plot with great soil conditions.
Short term redundant power supply in line with construction schedule at 30 MW.
Long term power supply >100 MW.
Access to municipality district heating system for off-load of waste heat.
Existing road network.
capacity in the region.
Brown field plot currently zoned for social/educational services in the vicinity of
Kouvola city centre.
Plot building rights 22 800 sqm and plot size 10 hectare with possibility to increase
both footprint and building rights to nearby plots.
Mostly levelled plot with great soil conditions.
Short term redundant power supply in line with construction schedule at 30 MW.
Long term power supply >100 MW.
Access to municipality district heating system for off-load of waste heat.
Existing road network.
www.datacenterfinland.fi info@datacenterfinland.fi
Address:
Kalliojärvenpolku 6, 45740 Kouvola, Finland
Coordinates:
60.9022175,26.5741336
Owned by:
Type:
Brownfield
WWW:
Zoning readiness
Zoning not started, normal handling timeNotes on investment regulatory readiness
Current zoning for the area is social services (i.e hospital, services living etc.) There is no longer use for such services in this area and a re-zoning into either Data Center operations or industrial operations is possible. Discussions held with the municipality indicates re-zoning could be executed as fast as in 6 months but probably in 12 months.Building right / [m2]
22 800Building right can be extended up to / [m2]
30 000Site area / [m2]
100 000Site area can be extended up to / [m2]
194 000Easements
Road access Fiber to the real estate north of the plot (Telia)Notes on site size and building permit
Building permit also covers current buildings on the plot
Design rules and regulations
None identified
Pre-approval of construction and environment permits, fire and rescue plan
Negotiations not startedSite shape
PolygonNotes on site topography
To most part level but north to south deviations approx. 5 meters
Natural water source available for cooling
Not availableNotes on cooling options
Municipality district heating grid currently in place and the site has an old heat plant
for back up heating to the system no longer operational. Therefore infra already in
place to feed excess heat into the district heating system.
for back up heating to the system no longer operational. Therefore infra already in
place to feed excess heat into the district heating system.
Type of ground
Predominately sand/gravel and to some extent bedrock
Levelling of plot
Plot is partly construction ready / levelledType of forestry (if plot not levelled)
Grass field and pine mostly
Layout plan of datacenter building(s)
No planExisting buildings
Four row houses and a multipurpose building on the site currently
Notes on existing infrastructure
20 Kv
Natural risks
No natural risks identified although this is a ground water area which to be taken
into consideration
into consideration
Proximity of major roads, airports, flight paths and railways
Railroad: 11 km
To highway: 2 km
Helsinki CBD: 130 km
Port of Kotka: 70 km
Helsinki-Vanta international airport: 130 km
To highway: 2 km
Helsinki CBD: 130 km
Port of Kotka: 70 km
Helsinki-Vanta international airport: 130 km
Proximity of near by communities
Kuusankoski: 3 km
Current access to the site
Two or more roadsEmergency vehicle accessibility
Easy access to the site through the local existing road network
Distance to nearest international airport / [km]
130Distance to nearest fire & rescue station / [km]
4Distance to nearest hospital or health care center / [km]
7What is needed to realize total power supply?
District power supplier upgrade of network
Lead time for total power supply to the site / [months]
48Redundancy power availability
Available (same as total main power feed)Arrangement of redundancy power
Two separate connections to main line which has circular feed or adding new line to
other 110 Kv main line in the area
other 110 Kv main line in the area
Distance to 20 kv power connection point / [km]
0Distance to 110 kv power connection point / [km]
1Distance to redundancy power connection point / [km]
1Distance to local grid substation, 110 kv / [km]
1Distance to national grid substation, 400 kv / 110 kv / [km]
7First phase electricity power supply (in 18 months or sooner)
4-6 MWFirst phase power supply to the site
0 - 18 monthsFirst phase electrical feed to the site
20 kVFirst phase redundancy power availability
Available (delivery time is longer than 18 months)Notes on power supply
It is possible to upgrade the power supply over time. This will however require
infrastructure investments by the local power company. The first ramp up stage is
within 24 months of order (no pre-requisites such as building permit but
irreversible) is 30 MW of redundant power
infrastructure investments by the local power company. The first ramp up stage is
within 24 months of order (no pre-requisites such as building permit but
irreversible) is 30 MW of redundant power
Local green energy
Not availableDetails on local green energy (suppliers)
To be investigated (solar, wind and water)
Commitment of local utility companies
Ongoing planning and investment readiness existsWater utilities on site
Potable water supply available; Waste water sewage available; Storm water drainage availableDistrict heating network
AvailableDistance to district heating network / [km]
0Natural gas availability on site
Natural gas availableDistance to natural gas network / [km]
0Opportunities to utilize waste heat
Exists.
Distance to delivery point / [km]
0Investment incentives
To be investigated.
Notes on local ecosystem
Availability of skilled labor force
Generally, good availability due to educational system of Finland as well as the
proximity to similar businesses in the region.
Generally, good availability due to educational system of Finland as well as the
proximity to similar businesses in the region.
Availability of skilled laborforce
Generally, good availability due to educational system of Finland as well as the
proximity to similar businesses in the region.
proximity to similar businesses in the region.
Person(s) provided this information
Tommi Liinamaa
tommi@liinamaa.fi
Availability
For saleSite address
Kalliojärvenpolku 6, 45740 Kouvola, Finland
Investment opportunities:
Ahvenkoski DC Site, Pyhtää (reserved until 09/2024)
Arctic Data House
Callio Data Center Campus Pyhäjärvi
Cool Scandinavia Business Park for Data Centers, Mäntsälä - Kapuli
Etelä-Nummelan yritysalue II
Hanko Data Parks 1: Hanko East DC
Hanko Data Parks 2: Koverhar DC
Hanko Data Parks 3: Raasepori DC
Hanko Data Parks 4: Karjaa DC
Helsinki Myllypuro Heating Plant Area
Helsinki Östersundom Area
Helsinki Salmisaari Powerplant
HOTT DC (NEW)
Joensuu NextGen Green Data Center Park
Joroinen Huutokoski Data Center Site (RESERVED)
Jyväskylä - Eastern Palokärki
Kangasala Tarastenjärvi Data Center Site
Kemintulli
Kotka, Mussalo Data Center Campus (reserved until 04/2024)
Kouvola Savontalo DC site
Kuusaa DC (New)
KyroCloud Park
Moreeni
Moreeni Hämeenlinna
Nokia Kolmenkulma Data Center Site
North Shore Data Center – Alholmen
Päivärinne Data Center site in Warkaus Green Tech Valley
Puhos Brown
Ranta-Luttila Data Center site in Warkaus Green Tech Valley
Seinäjoki Data Park, (Pihlajaniemi Data Center Site)
Tuusula - Hetzner Datacenter Park Helsinki
West51
Co-locations:
Atomidata Oy Data Center
CSC Kajaani Data Center
Dalsbruks Fabrik
Datacenter Finland
Digita Helsinki Pasila Data Centers
Digita Helsinki Pasila Pieni Paja Data Center
Glesys Pori Data Center
Glesys Tampere Data Center
Herman IT Data Center
Hetzner Online
North Shore AH3
North Shore ST8
Telia Helsinki Data Center
To LET: Data Center, Helsinki, Finland
Verne Helsinki Data Center