West51
The West 51 business area in Kirkkonummi, offers a one-of-a-kind opportunity. West 51 will bring together various operators, allowing new and innovative production facilities for commercial and data centres to relocate to the area. The construction of the first projects in West 51 are underway.
West 51 provides a unique setting by offering, through the Microsoft data centre to be built nearby, carbon-neutral district heat for the buildings in the area. Heat from data centers is supplied to the local district heating network. The distance to Fortum heat pump station is 0,7 km and the distance to the local grid substation 0,5 km.
West 51 is located along Länsiväylä (road 51), in the elbow of Kehä III, offering smooth access to the main highways and quick transport connections to a wide range of services. Helsinki CBD and the airport are half an hour away. Kirkkonummi is part of the Helsinki public transport area. Cyclists also appreciate the the great pedestrian and bicycle routes in the area.
|
Address:
Sundsbergintie, Sundsberg, 02450 Kirkkonummi, FINLAND
Coordinates:
60.14914548185299, 24.54620120635576
Owned by:
EKE-Rakennus Oy [2321457-0]
Type:
Greenfield
WWW:
Zoning readiness
Zoning ready for data center useBuilding right / [m2]
15 815Site area / [m2]
39 538Easements
A natural gas pipeline and an electrical line run through the site.Notes on site size and building permit
Block 2259 of plot 257-483-2-12 "Södergård"
Design rules and regulations
EU and national regulations. |
Architecturally high-quality facade is required. |
Pre-approval of construction and environment permits, fire and rescue plan
Negotiations not startedNotes on site topography
Relatively even surface. |
Natural water source available for cooling
Not availableNotes on cooling options
Air cooling / Cooling will be arranged by heat pumps. Heat is supplied to local district heating network. Distance to Fortum heat pump station 0,7 km. |
Type of ground
Silt/ gravel. |
Levelling of plot
Plot is not construction ready / levelledType of forestry (if plot not levelled)
Cultivated fields |
Layout plan of datacenter building(s)
No planNatural risks
No natural risks that would threaten the Data Center operations. |
Proximity of major roads, airports, flight paths and railways
Railroad: 3 km To highway: 0,5 km Helsinki CBD: 22 km Port of Helsinki: 25 km Helsinki-Vantaa International airport: 35 km |
Proximity of hazardous industries
No hazardous industries near by. |
Proximity of near by communities
Helsinki CBD: 22 km Espoo, Espoonlahti: 8 km Kirkkonummi centre: 9 km |
Current access to the site
One roadNotes on current and planned access to the site
Plot connections and municipal infrastructure will be built in phases during 2023-2024. |
Emergency vehicle accessibility
Easy access to the site through the local existing network. |
Distance to nearest international airport / [km]
35Distance to nearest fire & rescue station / [km]
9Distance to nearest police station / [km]
9Distance to nearest hospital or health care center / [km]
9Availability of public transportation
Bus stops at a walking distance |
What is needed to realize total power supply?
Phased power update |
Lead time for total power supply to the site / [months]
36Redundancy power availability
Not availableArrangement of redundancy power
Lead time for redundancy power approx. 24-36 months.
Distance to 10 kv power connection point / [km]
0.5Distance to 20 kv power connection point / [km]
0.5Distance to 110 kv power connection point / [km]
0.5Distance to redundancy power connection point / [km]
0.5Distance to local grid substation, 110 kv / [km]
0.5Distance to national grid substation, 400 kv / 110 kv / [km]
6First phase electricity power supply (in 18 months or sooner)
11-20 MWFirst phase power supply to the site
0 - 18 monthsFirst phase electrical feed to the site
110 kVFirst phase redundancy power availability
Available (delivery time is longer than 18 months)Notes on power supply
It is possible to upgrade the power supply gradually over time. The current estimate is up to 100 MW. |
Local green energy
Not availableLocal electricity supplier(s)
Caruna Oy
Commitment of local utility companies
Negotiations initiatedWater utilities on site
Potable water supply available; Waste water sewage available; Storm water drainage availableNotes on water utilities
The schedule for constructing municipal infrastructure within the zoning area is from 2023 to 2025.
District heating network
AvailableDistance to district heating network / [km]
0.5Notes on district heating network
Heat from data centers is supplied to the local district heating network. The distance to Fortum heat pump station is ca. 0.7 km.
Natural gas availability on site
Natural gas availableDistance to natural gas network / [km]
1Opportunities to utilize waste heat
Heat from data centers is supplied to the local district heating network. The distance to Fortum heat pump station is 0,7 km.
Distance to delivery point / [km]
0.7Availability of skilled laborforce
Due to proximity to the capital region, labor available. The Sundsberg area is a vibrant region popular among families, which increases the motivation of skilled workers and professionals to seek employment in the area's businesses. The area is set to undergo significant growth in the coming years as new residential areas are planned. |
Higher education resources
Aalto and Helsinki Universities close by |
Person(s) responsible for provided information
Thomas Dalenius
Thomas.dalenius@eke.fi
Miikka Huhtamäki
miikka.huhtamaki@eke.fi
Person(s) provided this information
Miikka Huhtamäki
miikka.huhtamaki@eke.fi
Availability
For saleSite address
Sundsbergintie, Sundsberg, 02450 Kirkkonummi, FINLAND
Investment opportunities:
Ahvenkoski DC Site, Pyhtää (reserved until 09/2024)
Arctic Data House
Callio Data Center Campus Pyhäjärvi
Cool Scandinavia Business Park for Data Centers, Mäntsälä - Kapuli
Greater Helsinki region, Riihimäki
Hanko Data Parks 1: Hanko East DC
Hanko Data Parks 2: Koverhar DC
Hanko Data Parks 3: Raasepori DC
Hanko Data Parks 4: Karjaa DC
Helsinki Hanasaari Powerplant
Helsinki Kanavaranta
Helsinki Kanavaranta B
Helsinki Myllypuro Heating Plant Area
Helsinki Östersundom Area
Helsinki Salmisaari Powerplant
Helsinki Töölö
Helsinki Vuosaari
Hollola Data Center Site
Home of Data, Oulu – Rusko Site
HOTT DC (NEW)
Joensuu NextGen Green Data Center Park
Joroinen Huutokoski Data Center Site
Jyväskylä - Eastern Palokärki
Kangasala Tarastenjärvi Data Center Site
Kemintulli
Kotka, Mussalo Data Center Campus (reserved until 04/2024)
Kouvola Savontalo DC site
Kuusaa DC (New)
Moreeni
Moreeni Hämeenlinna
Nokia Kolmenkulma Data Center Site
North Shore Data Center – Alholmen
Päivärinne Data Center site in Warkaus Green Tech Valley
Puhos Brown
Ranta-Luttila Data Center site in Warkaus Green Tech Valley
Riihimäen Portti data center site I
Riihimäen Portti data center site VI (Reserved)
Riihimäki Sorri Datacenter (Reserved)
Seinäjoki Data Park, (Pihlajaniemi Data Center Site)
Tuusula - Hetzner Datacenter Park Helsinki
Vallu Data Center Site
West51
Co-locations:
CSC Kajaani Data Center
Dalsbruks Fabrik
Datacenter Finland
Digita Helsinki Pasila Data Centers
Digita Helsinki Pasila Pieni Paja Data Center
Herman IT Data Center
Hetzner Online
North Shore AH3
North Shore ST8
Telia Helsinki Data Center
To LET: Data Center, Helsinki, Finland
Verne Helsinki Data Center
Verne Pori Data Center
Verne Tampere Data Center