Data centers West51

Data centers

West51

The West 51 business area in Kirkkonummi, offers a one-of-a-kind opportunity. West 51 will bring together various operators, allowing new and innovative production facilities for commercial and data centres to relocate to the area. The construction of the first projects in West 51 are underway.
 
West 51 provides a unique setting by offering, through the Microsoft data centre to be built nearby, carbon-neutral district heat for the buildings in the area. Heat from data centers is supplied to the local district heating network. The distance to Fortum heat pump station is 0,7 km and the distance to the local grid substation 0,5  km.
 
West 51 is located along Länsiväylä (road 51), in the elbow of Kehä III, offering smooth access to the main highways and quick transport connections to a wide range of services. Helsinki CBD and the airport are half an hour away. Kirkkonummi is part of the Helsinki public transport area. Cyclists also appreciate the the great pedestrian and bicycle routes in the area.
 
Address: Sundsbergintie, Sundsberg, 02450 Kirkkonummi, FINLAND
Coordinates: 60.14914548185299, 24.54620120635576
Owned by: EKE-Rakennus Oy [2321457-0]
Type: Greenfield
WWW:

Zoning readiness

Zoning ready for data center use

Building right / [m2]

15 815

Site area / [m2]

39 538

Easements

A natural gas pipeline and an electrical line run through the site.

Notes on site size and building permit

Block 2259 of plot 257-483-2-12 "Södergård"

Design rules and regulations

EU and national regulations.
Architecturally high-quality facade is required.

Pre-approval of construction and environment permits, fire and rescue plan

Negotiations not started

Notes on site topography

Relatively even surface.

Natural water source available for cooling

Not available

Notes on cooling options

Air cooling / Cooling will be arranged by heat pumps. Heat is supplied to local district heating network. Distance to Fortum heat pump station 0,7 km.

Type of ground

Silt/ gravel.

Levelling of plot

Plot is not construction ready / levelled

Type of forestry (if plot not levelled)

Cultivated fields

Layout plan of datacenter building(s)

No plan

Natural risks

No natural risks that would threaten the Data Center operations.

Proximity of major roads, airports, flight paths and railways

Railroad:   3 km
To highway:   0,5 km
Helsinki CBD: 22 km
Port of Helsinki:   25 km
Helsinki-Vantaa International airport:   35 km

Proximity of hazardous industries

No hazardous industries near by.

Proximity of near by communities

Helsinki CBD: 22 km
Espoo, Espoonlahti: 8 km
Kirkkonummi centre: 9 km

Current access to the site

One road

Notes on current and planned access to the site

Plot connections and municipal infrastructure will be built in phases during 2023-2024.

Emergency vehicle accessibility

Easy access to the site through the local existing network.

Distance to nearest international airport / [km]

35

Distance to nearest fire & rescue station / [km]

9

Distance to nearest police station / [km]

9

Distance to nearest hospital or health care center / [km]

9

Availability of public transportation

Bus stops at a walking distance

What is needed to realize total power supply?

Phased power update

Lead time for total power supply to the site / [months]

36

Redundancy power availability

Not available

Arrangement of redundancy power

Lead time for redundancy power approx. 24-36 months.
 

Distance to 10 kv power connection point / [km]

0.5

Distance to 20 kv power connection point / [km]

0.5

Distance to 110 kv power connection point / [km]

0.5

Distance to redundancy power connection point / [km]

0.5

Distance to local grid substation, 110 kv / [km]

0.5

Distance to national grid substation, 400 kv / 110 kv / [km]

6

First phase electricity power supply (in 18 months or sooner)

11-20 MW

First phase power supply to the site

0 - 18 months

First phase electrical feed to the site

110 kV

First phase redundancy power availability

Available (delivery time is longer than 18 months)

Notes on power supply

It is possible to upgrade the power supply gradually over time. The current estimate is up to 100 MW.

Local green energy

Not available

Local electricity supplier(s)

Caruna Oy

Commitment of local utility companies

Negotiations initiated

Water utilities on site

Potable water supply available; Waste water sewage available; Storm water drainage available

Notes on water utilities

The schedule for constructing municipal infrastructure within the zoning area is from 2023 to 2025.

District heating network

Available

Distance to district heating network / [km]

0.5

Notes on district heating network

Heat from data centers is supplied to the local district heating network. The distance to Fortum heat pump station is ca. 0.7 km.

Natural gas availability on site

Natural gas available

Distance to natural gas network / [km]

1

Opportunities to utilize waste heat

Heat from data centers is supplied to the local district heating network. The distance to Fortum heat pump station is 0,7 km.

Distance to delivery point / [km]

0.7

Availability of skilled laborforce

Due to proximity to the capital region, labor available.  The Sundsberg area is a vibrant region popular among families, which increases the motivation of skilled workers and professionals to seek employment in the area's businesses. The area is set to undergo significant growth in the coming years as new residential areas are planned.

Higher education resources

Aalto and Helsinki Universities  close by

Person(s) responsible for provided information

Thomas Dalenius

Thomas.dalenius@eke.fi

Miikka Huhtamäki

miikka.huhtamaki@eke.fi

Person(s) provided this information

Miikka Huhtamäki

miikka.huhtamaki@eke.fi

Availability

For sale

Site address